Where does BASIC Engineering stops?

 

Do you know where FEED stops?

Take the test!

Follow the link below to print the test form:

https://docs.google.com/file/d/0BxBpbhTfKqRBTXZocG1zOGdlUHc/edit?usp=sharing

Done? Have a look at the solution:

https://docs.google.com/file/d/0BxBpbhTfKqRBSXVSdFdtelFZbU0/edit?usp=sharing

And now here is why...."

Continue reading
2229 Hits
0 Comments

How does Retained Logic, Progress Override and Actual Dates in Scheduling Options work?

How does Retained Logic, Progress Override and Actual Dates in Scheduling Options work?

 

4
 
 
Continue reading
1493 Hits
0 Comments

How much detailed is DETAIL Engineering?

How much detailed is DETAIL Engineering?

Similarly to realizing where BASIC Engineering stops (see corresponding post) it’s interesting to realize that DETAIL Engineering does not produce all execution drawings: some are left to the construction contractor to develop.

The civil DETAIL design performed by the EPC Contractor, e.g. that of a foundation or a concrete structure, entails design, calculations and issue of the re-inforcement and formwork drawings (as shown on page 77). The Bar Bending Schedule (see illustration) which is required for the prefabrication of the rebars, is produced by the civil contractor.

Continue reading
2296 Hits
0 Comments

How to modify Activity ID Suffix in Primavera P6

How to modify Activity ID Suffix in Primavera P6

Tags:
Continue reading
5260 Hits
0 Comments

Critical path: Total Float vs Longest Path

Critical path: Total Float vs Longest Path

TheLongestPath_001
 

Oracle Primavera P6 offers two ways to define a critical activity in a project schedule. These are:

  • Total Float less than or equal to [0.0h]
  • Longest Path

Which one you use depends on three things. 1. the setting you choose in the Project view’s Settings tab: 2. the setting you choose in the Schedule Options dialog, and 3. that you understand the difference between the two options.  Primavera P6 defaults to the Total Float method.

 

This article is mostly about item three – what is the difference between Total Float criticality and the Longest Path? There’s some confusion about this in the industry because unfortunately the term “Critical Path” and “Longest Path” often get used interchangeably. In reality they are two distinct methods of calculating critical path and P6 can do either.

Continue reading
4320 Hits
0 Comments

Primavera become slow – Limitations of SQL Server Express Edition

Primavera become slow – Limitations of SQL Server Express Edition

1
 

A lot of people are using Primavera with SQL Express database. And after using Primavera for a long time, we may realize the software become slow.

Our database is become bigger and bigger. And the slow performance is may be because of the limitations of SQL Server Express Edition, not because of the CPU or RAM.


 

1

 

Based on the table you can see SQL Express only support:

  • 1 CPU
  • 1 GB RAM
  • 10 GB for database size.

No matter how your PC is strong, it only take a few resource from it.

So you may consider buy SQL Standard Edition before upgrade your PC hardware.

Tags:
Continue reading
5076 Hits
0 Comments

Search

Archived Posts

January
April
May
June
July
September
November
December
January
February
March
April
May
June
July
August
September