Welcome to PCI Blogs - selection of thoughts and tips shared by Project Controls community.
Refer to this list for definitions of essential Project controls / Cost Engineering / Earned Value management, terms submitted by Project Controls practitioners from around the world.
Welcome to PCI Templates - Selection of some practical Project Controls templates for the community.
Welcome to PCI Videos- Selection of some educational content to help you understand Project Controls
Welcome to PCI Paperback - Selection of some handpicked paperback literature for the community. This section will be replaced by spotify integrated books for easy reference




|
Hi,
What are types of schedule and when they are used in a project life cycle?
Thanks
|
|
|
|
Hi
The type of schedule used is directly related to the size, scope, and complexity of the project’s planning, reporting, management and controlling needs. Types of schedule include the following:
[li]Milestone[/li]
[li]Bar charts (sometimes referred to as Gantt charts)[/li]
[li]Critical Path Method (CPM)[/li]
[li]Program Evaluation and Review Technique (PERT)[/li]
[li]Linear schedule[/li]
[li]Line-of-balance[/li]
[li]Rolling wave[/li]
[li]List or Punch list[/li]
At key times in the life of a project, the type of schedule may change from one format to another, such as from a graphical presentation to a simple list of requirements or visa versa.
During the life cycle of the project different control level schedules may be used to depict the schedule, contractual issues and concerns, or schedule progress for the various stakeholders.
Thanks
Smith
|
|